Installation of Braided Packing Installation of Braided Packing

一卡二卡三卡-岳乳丰满一区二区三区-能免费看18视频网站-女人囗交吞精囗述-四虎永久免费观看-美女尿尿网站-天天综合久久综合-免费看h网站-黑人操日本女优-激情视频亚洲-gogo高清视频在线观看

DONDE SEAL

CHINA

Professional Of Mechanical Packing & Industrial Gasket

  Home About Us Products Technology Equipment Contact Us English Version 中文版  

How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Figure 4: Joints of successive packing should be staggered at 90°. When enough rings have been installed so that the nose of the gland will reach them, individual tamping should be supplemented by using the gland.

 

5. After the last ring is installed. Put the gland in place and take up bolts finger tight or very slightly snugged up. Do not jam packing into place with excessive

gland loading. Start the pump and take up bolts until leakage is decreased to a tolerable minimum. Make sure gland bolts are adjusted evenly. Stopping leaking entirely at this point will cause the packing to burn up.

6. Allow packing to leak freely when starting up a newly packed pump. Excessive leakage during the first hour of operation will result in a better packing job over a longer period of time. Take up gland bolts gradually as the packing seats to a tolerable level of 10 to 12 drops per minute per inch of shaft diameter. Never try to stop leakage entirely, unless packing manufacturer indicated that it is safe to do so.

7. When specified by the pump manufacturer, provide means of lubricating the shaft and the packing through the lantern ring by supplying water, oil, grease or liquid handled in the pump. Fittings for this purpose are standard on many pumps.

8. If the stuffing box has a lantern ring , make sure that the lantern ring, as installed, is slightly behind the fluid inlet so that it will move under the inlet as the follower pressure is applied.See Figure 5

 

9. On both centrifugal and reciprocating pumps, about 70% of wear is on the outer two packing rings nearest the gland. However, each additional ring does throttle some fluid pressure. On most equipment, there must be enough rings so if one fails, another does the sealing, and the machine need not be shut down.

Installation of SEPCO's Patented Spiral Pack Packing:

Warning: Never wind bulk or coiled packing into the stuffing box. Cut the packing into separate rings before installation. Use the same procedure of installing rings outlined in Steps 1-9.

Installation of PTFE 8 Graphite Yarn Packing:

Warning: Seat rings gently, the gradually tighten bolts after pump is on stream. Use the same procedure of installing rings outlined in Steps 1-9. >>The End

 

[1]

[2] BACK Total 2 Page 1/2
浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn
主站蜘蛛池模板: 西平县| 邹城市| 钟山县| 虎林市| 宁都县| 永清县| 保靖县| 澜沧| 抚州市| 桑植县| 讷河市| 乐陵市| 邢台县| 漳浦县| 平武县| 商洛市| 通渭县| 建始县| 南开区| 翁源县| 开鲁县| 杨浦区| 和田县| 南安市| 万山特区| 栖霞市| 东乌| 阿拉善右旗| 东平县| 阜城县| 阿克| 青河县| 砀山县| 赣州市| 香格里拉县| 出国| 南宁市| 阳谷县| 山东省| 肇州县| 余江县|